Construction, Phase 2 -- January, 2000

About a year later, we designed a series of walls and terraces to complete the lower half of the back yard.  The walls are dry-stacked.   The central boulder is drilled out and leveled on an in-ground water tank with a recirculating pump.  A layer of river gravel will be added to finish the fountain.  Originally we had planned a lower wall below the stone steps (photo at upper right).  Since that would have placed the fountain too high, we had the fountain rebuilt and a second-tier wall added above the fountain (photo lower right).
 

Return to Photo GalleriesReturn to Photo Galleries